Ofgem Feed-in Tariff FiT degression figures released for 2014
On 24 January 2014, Ofgem released the degression levels for each Feed-in Tariff band that will take place from 1 April 2014.
These levels are calculated based on uptake of the scheme during 2013.
Click here to see a table of the new tariffs.
Technology | Degression Band | Comment |
---|---|---|
Hydro | All scales | Based on actual data between January - December 2013, all hydro tariffs (with the exception of >2-5MW band) will degress by 5% since deployment levels during 2013 have exceeded the minimum (12,500kW) to trigger a 5% degression. The tariff for >2-5MW installations is set at the RO equivalent level, the total installed capacity for this degression band during 2013 has not exceeded the minimum (25,000kW) to trigger a 10% degression. |
Wind | 0-100kW | Based on actual data between January - December 2013, deployment levels during 2013 have exceeded the minimum (13,100kW) to trigger a 20% degression. |
>100kW-5MW | Based on actual data between January - December 2013, all wind tariffs within this degression band will degress by 20% since deployment levels during 2013 have exceeded the minimum (73,400kW) to trigger a 20% degression. | |
Anaerobic Digestion | 0-500kW | Based on actual data between January - December 2013, all tariffs within this degression band will degress by 20% since deployment levels during 2013 have exceeded the minimum (9,000kW) to trigger a 20% degression. |
>500kW-5MW | Based on actual data between January - December 2013, there will be no degression for this band. The tariff for this >500kW-5MW installations is set at the RO equivalent level, the total installed capacity for this degression band during 2013 has not exceeded the minimum (38,400kW) to trigger a 10% degression. |